What can you achieve in a day?

admin Uncategorized

The team at 3R refurbished this existing Hotel Bar cabinetry to give it a brand new marble finish.

image

image

Onsite for 8 hours, and ensuring the bar was able to keep trading throughout the installation.
A great result, the finish looks amazing and the clients are very happy.

image

The Process

  • All stock and shelves were removed
  • Surfaces cleaned, repaired and prepared for installation
  • Application applied on site within 8 hours

The Benefits

  • A new fresh look was achieved
  • No major disruption to the Hotel
  • By utilising the existing cabinetry we saved the client money
  • The bar continued to trade during the installation process, so no loss of income

image

image

Visit our website: www.3r-film.com